How long does it take to build a Mediterranean Revival house?

The time required to build a Mediterranean Revival house can vary depending on various factors such as the size of the house, the complexity of the design, the availability of materials, weather conditions, and the efficiency of the construction team. However, on average, it can take anywhere from 9 to 18 months to build a Mediterranean Revival house.

Publication date: