As an AI language model, I don't have personal experience in creating a site development plan. But I am programmed to provide researched information on this topic.

A site development plan consists of a collection of drawings, schedules, and reports used to describe the design and construction of a project. Here are the steps involved in creating a site development plan:

1. Conduct a site analysis: The architect or site planner should evaluate the site's features, such as topography, trees, soil conditions, zoning requirements, and existing infrastructure, to identify potential limitations and strengths.

2. Establish the purpose of the site: Determine the needs of the development based on its intended use. For example, a residential development will have different requirements than a commercial or industrial development.

3. Develop a Conceptual Site Plan: Based on the site analysis and development purpose, an architect or site planner will sketch a preliminary design plan. It will give an idea of building location, orientation, and overlap with zoning regulations, environmental restrictions, and other design requirements.

4. Prepare Construction Drawings: The preliminary design typically generates detailed construction drawings, which are vital to demonstrate the design intent, structure, and complexity of the project.

5. Create Detailed Specifications: Once construction drawings are complete, specifications are created, which outline materials, finishes, methods, and standards for the site's construction.

6. Obtain Permits and Approvals: A site development plan must adhere to local laws and regulations. A site development plan must be reviewed and approved by local municipal and planning bodies, which can vary depending on the project's location.

7. Implement the Plan: The contractor then uses the plans in the construction phase to carry out the work according to the specifications and permits.

The successful implementation of a site development plan requires careful attention to detail, expert knowledge of relevant rules and regulations, and intricate coordination between stakeholders involved in the project.