A site plan is developed through the following steps:

1. Assessing the Site: A site plan starts with assessing the land, including utilities, ground slope, soil conditions, existing structures, vegetation, and any restrictions or zoning laws.

2. Determine Purpose: The purpose of the site plan must be determined. The purpose could be for a commercial building, residential housing, or recreation facilities.

3. Drafting: Drafting is the process of drawing the site plans using computer-aided design (CAD) software.

4. Landscaping: Landscaping is essential in creating a beautiful and functional site plan. It involves designing and creating outdoor spaces that complement the surrounding environment.

5. Lighting: Good lighting is crucial for safety and ambiance. Site plan drafters must include appropriate lighting fixtures in their plans for both daytime and nighttime use.

6. Drainage: Proper drainage is important for the effective removal of water from the site to prevent erosion, soil saturation, or flooding.

7. Accessibility: Site planning must take into consideration the accessibility of the site to people and vehicles, accessibility for disabled people, and consideration of building codes.

8. Finalizing the Site Plan: Once the draft is complete, the site plan must be refined into a final plan, including detailed measurements, materials, and appropriate labels.

9. Review: The final site plan needs approval from the appropriate regulatory agencies such as local municipalities, environmental groups or the construction companies that will oversee the building process.